| The Five Phase View of the ILM Circular Process for IoD
|
| <== Assess ==>
| <== Strategy ==>
| <== Design ==>
| <== Implement ==>
| <== Manage ==>
|
| IoD is a concept to achieve a Strategic goal. IoD requires the Pervasive Information Fabric using agents and multi-agents. To achieve this architecture the ILM (Information Lifecycle Management) phases of Strategy, Design and Implement must coordinate. The ILM phases of Assess and Manage are monitoring activities of the Pervasive Information Fabric.
|
IoD Strategy
an ILM enabled IT infrastructure
|
E2EIoD (End-to-End IoD)
an ILM enabled IoD Strategy and Architecture
|
Front-Office Front-End User-Facing ROI
| Search ==> <== Find <== Obtain
| E2EIoD Processes and Architecture
| Search ==> <== Find <== Obtain
| Back-Office Back-End Storage-Facing TCO
|
E2EIoD Processes
The basic IT processes of ILM for the E2EIoD Process Information areas of Online, Nearline, Offline
|
| <== Online ==>
| <== <== ==> ==>
| <== Nearline ==>
| <== <== ==> ==>
| <== Offline ==>
|
| Configuration
| Replication
| Migration
| Re-Configuration
| Redeployment
|
Typically new Units of Information (UoI) and/or Technology (UoT) coming Online, Nearline, or Offline
| Online, Nearline, Active mirrors
| Nearline, Offline, Passive mirrors
| The redeployment or decommissioning of UoT (Units of Technology)
| The process of decommissioning and re-commissioning
|
SLM/SLA
(Service Level Management/Agreement System)
|
| Event Management System
|
| Event Notification System
|
| InfoTone System
|
SFO (Search-Find-Obtain)
| IHA (Information High Availability)
| II (Information Integrity)
| DR (Disaster Recovery)
| BC (Business Continuance)
|
| Lower Metric Processes
|
| InfoTone Connect System
|
SFO (Search-Find-Obtain)
| IHA (Information High Availability)
| II (Information Integrity)
| DR (Disaster Recovery)
| BC (Business Continuance)
|
| SFO is the key process for the Findability feature of IoD
| Information High Availability
| Backup/Recovery Archive/Retrieve Migrate/Recall Information-Replication Disaster-Recovery
| Disaster Recovery
| Business Continuance
|
ILM Lower Metric Definitions
(a work in progress)
|
| MUoI
| MUoT
| SLA (Service Level Agreement)
| UoI
| UoT
|
|
|